Two technicians walk through an operations office
Solution · CTO · Network operations

Platform continuity and operations

Critical platforms are deployed with signed acceptance and operated under a service level agreement.

The problem

The demand on the operator

Signaling platforms do not tolerate interruptions. Operating them requires scarce expertise, tested contingency and clear responsibilities between the parties.

The response

ATC's response

ATC deploys with four acceptance milestones, provides severity-based support and operates its own and third-party platforms. Network Engineering prepares the RF infrastructure.

How it works

How it operates in the network

  1. Deployment

    Four milestones with acceptance test protocols signed by both parties and a rollback plan.

  2. Support

    Severity-based support, with technical escalation defined in the agreement.

  3. Operation

    Operational responsibility transferred under a service level agreement, by platform or by element.

Results

Results for the operator

  • Continuous service of critical platforms
  • Responsibilities stated in the agreement
  • Contingency with a tested plan
Next step

Data is processed on the infrastructure the operator designates, under its control.

ATC reviews the platform the operator prioritizes and proposes the appropriate configuration. Sizing and review are provided at no cost.

  • Review of the platform and the network interfaces
  • Sizing according to the operator's infrastructure
  • Staged proposal: module, platform or delegated operation

3GPPGSMAITU-TTM Forum

No-cost review and sizing, without access to production.