Person on a rooftop facing the city at night; a thread of light connects their phone with the sky
For the network engineering and operations area

A single EIR, reliable and serving the entire operator

For 2G, 3G and 4G, and 5G depending on scope, with high availability, contingency and list migration.

The EIR the regulation requires · What Sx-EIR adds

The EIR the regulation requires

Your country's regulation requires control over which devices use the network. The EIR is the platform that enforces it, and ATC delivers it on schedule, in line with 3GPP and GSMA, and adapts it when the regulation changes.

What Sx-EIR adds

Mobile identity governance: in that same check, Sx-EIR verifies the IMEI, the IMSI and the MSISDN together and applies the rule your operator defines. The network receives allowed, observed or blocked, and every response is recorded.

Network engineering and operations

Your area's challenges and what Sx-EIR delivers

Your area's challenges and what Sx-EIR delivers
The challengeThe solutionThe module
EIR without vendor support or with its license at the limitEIR modernization with migration of your current lists.Integration, migration and subscriber notice
A different EIR for each technologyA single EIR for 2G, 3G and 4G, and 5G depending on the project scope.Sx-EIR base
Risk of service unavailabilityRedundant critical functions, contingency mode and, depending on scope, two sites active at the same time.Sx-EIR base
Limited visibility of capacity, rejections and device baseDashboards of capacity, rejections and device base by technology.Dashboards by area
Support split among several vendorsIf the operator so chooses, ATC operates the EIR under a service level agreement.Operation and service

What your operator provides: the connection of its switches, its current lists, maintenance windows and technical counterparts.

What your area gains

Operating cost

  • A single EIR that grows module by module, with delegated operation if the operator so chooses.
  • The decision belongs to the operator; Sx-EIR applies and records.

Signed acceptance

01

Signed acceptance

Four milestones, eight acceptance test protocols and fourteen closing deliverables, with the license in the operator's name. ATC delivery framework.

No-cost diagnostic

The diagnostic starts from the solution the operator prioritizes. Sizing and review are free of charge.

Request a diagnostic

Content version: v06, 17-nov-2026.